{"id":6240,"date":"2026-11-11T07:26:44","date_gmt":"2026-11-11T07:26:44","guid":{"rendered":"https:\/\/www.canadametal.com\/?p=6240"},"modified":"2026-11-11T08:45:56","modified_gmt":"2026-11-11T08:45:56","slug":"supply-chain-disruption-shielding-material-sourcing","status":"publish","type":"post","link":"https:\/\/www.canadametal.com\/supply-chain-disruption-shielding-material-sourcing\/","title":{"rendered":"How Supply Chain Disruption Is Changing the Way Defense and Aerospace Programs Source Critical Shielding Materials"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Supply disruption can turn a routine shielding order into an engineering and scheduling problem. For defence and aerospace programs with <\/span><a href=\"https:\/\/www.canadametal.com\/protection\/radiation-protection\/\"><b>radiation shielding<\/b><\/a><span style=\"font-weight: 400;\"> requirements, material availability is only one part of delivery readiness. Fabrication capacity, processing dependencies, documentation, and approval requirements can also affect when a component becomes usable.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Sourcing critical shielding materials therefore requires a broader procurement assessment. Teams need to understand where dependencies exist and which alternatives can meet established program requirements.<\/span><\/p>\n<div class=\"egs-content-wrap\">\n<p class=\"font-21\"><b>People Also Ask<\/b><\/p>\n<h2><b>Why does supply disruption affect shielding procurement?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Shielding procurement can depend on material availability, processing, fabrication capacity, inspection, and required documentation. A disruption at any stage can affect delivery or acceptance even when the raw material remains available.<\/span><\/p>\n<h2><b>Does local sourcing eliminate supply chain risk?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">No. Supplier location is only one consideration. A nearby supplier may still depend on external feedstock, processing, subcontractors, or transportation. Procurement teams should assess these dependencies alongside manufacturing capabilities and delivery requirements.<\/span><\/p>\n<\/div>\n<h2><b>Availability Means More Than Material in Stock<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">An available raw material does not necessarily mean an approved shielding component is ready for use.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Different shielding materials and product forms can require different processing and fabrication steps. Availability must therefore be evaluated across the complete path from raw material to finished component.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">That path can include:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Raw material availability<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Required processing<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Fabrication capacity<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Subcontracted operations<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Inspection<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Documentation<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Transportation<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Program acceptance<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Procurement teams should confirm what a quoted lead time actually represents. A supplier may have material available while fabrication or another required process follows a different schedule.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The relevant milestone is when the required material or component can enter the program&#8217;s established acceptance process. Stock availability alone does not establish that date.<\/span><\/p>\n<h2><b>Additional Suppliers Do Not Automatically Reduce Supply Risk<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Adding another supplier can provide an additional purchasing option. It does not necessarily create an independent supply route.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Different suppliers may rely on the same feedstock source, processor, subcontractor, or transportation network. A disruption affecting that shared dependency can therefore affect multiple sources.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Supplier assessments can consider:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Raw material origins and processing locations<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Manufacturing capacity for the specified product<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reliance on subcontracted operations<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Dependencies shared with existing suppliers<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Options when a required input or process becomes unavailable<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">An alternative source becomes more useful when it can satisfy the applicable specification, documentation, and delivery requirements.<\/span><\/p>\n<h2><b>Supplier Alternatives and Material Alternatives Are Different<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Waiting until a shortage occurs can limit the time available to evaluate sourcing alternatives. Engineering, quality, and procurement teams can identify potential alternative sources and material options before a disruption creates an urgent requirement.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, an alternative supplier and an alternative material are not the same contingency.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A new supplier may be able to provide material or components against an existing specification. The program may still need to determine whether the new source satisfies applicable purchasing and approval requirements.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A material substitution can introduce additional considerations. Different material properties, dimensions, fabrication methods, or component configurations may require engineering review or other approval activities.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Availability should therefore be considered alongside the work required to make an alternative usable within the established design.<\/span><\/p>\n<h2><b>Understand Which Requirements Can and Cannot Change<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">A supply disruption does not automatically make another available material an acceptable replacement.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Procurement teams need to understand which requirements are fixed by the design and which alternatives can be considered through the applicable review process. Material composition, shielding performance, dimensions, fabrication requirements, interfaces, and documentation may all influence that assessment.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This distinction is important when evaluating contingency options.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A readily available material may provide little sourcing value if it cannot satisfy the established requirements. Conversely, identifying acceptable alternatives before a disruption can give engineering and procurement teams more time to evaluate sourcing options.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The goal is not simply to locate available material. It is to maintain access to materials and components that remain suitable for the intended application.<\/span><\/p>\n<h2><b>Documentation Is Part of Delivery Readiness<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Physical delivery does not always complete the procurement process. Required documentation can form part of the acceptance review.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Traceability can connect a delivered component with its material and manufacturing records. Where specified documentation is required for acceptance, missing records can delay component review.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Purchasing requirements should clearly identify applicable documentation. Depending on the program, this may include material identification, inspection records, drawing revisions, or other required records.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Canada Metal North America supplies radiation shielding materials for industrial applications where material traceability and documentation can form part of procurement requirements.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The <\/span><a href=\"https:\/\/www.canadametal.com\/insights\/radiation-shielding-materials-and-procurement-guide\/\"><b>Radiation Shielding Materials and Procurement Guide<\/b><\/a><span style=\"font-weight: 400;\"> provides a broader framework for evaluating shielding materials, fabrication requirements, supplier capabilities, and procurement considerations before sourcing decisions are made.<\/span><\/p>\n<h2><b>Inventory Is Only One Part of Supply Resilience<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Holding additional inventory can help address certain interruptions, but inventory alone does not create a resilient shielding supply strategy.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Extra stock cannot resolve every issue involving fabrication capacity, supplier dependencies, documentation, or material approval. It also cannot make an unsuitable material appropriate for an established design.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Inventory decisions should therefore be considered alongside the consequences of interruption, storage requirements, expected demand, replacement availability, and potential design changes.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Procurement teams can also consider how forecast visibility, staged deliveries, and supplier communication fit within continuity planning. The appropriate approach depends on the material, component, and program requirements.<\/span><\/p>\n<h2><b>Planning Extends Beyond the Next Order<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Sourcing critical shielding materials requires coordination between procurement, engineering, quality, and manufacturing requirements.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A useful sourcing assessment looks beyond the next purchase order. It considers where materials originate, which processes are required, where shared dependencies exist, what documentation is needed, and what happens if the preferred source becomes unavailable.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Supply resilience for critical shielding materials therefore involves more than keeping additional material in stock. Understanding material sources, processing dependencies, fabrication capacity, documentation, alternative suppliers, and approval requirements can provide a clearer basis for continuity planning.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The objective is consistent access to shielding materials and components that meet the program&#8217;s established requirements.<\/span><\/p>\n<h2><b>Frequently Asked Questions<\/b><\/h2>\n<style>#sp-ea-6242 .spcollapsing { height: 0; overflow: hidden; transition-property: height;transition-duration: 300ms;}#sp-ea-6242.sp-easy-accordion>.sp-ea-single {margin-bottom: 10px; border: 1px solid #e2e2e2; }#sp-ea-6242.sp-easy-accordion>.sp-ea-single>.ea-header a {color: #444;}#sp-ea-6242.sp-easy-accordion>.sp-ea-single>.sp-collapse>.ea-body {background: #fff; color: #444;}#sp-ea-6242.sp-easy-accordion>.sp-ea-single {background: #eee;}#sp-ea-6242.sp-easy-accordion>.sp-ea-single>.ea-header a .ea-expand-icon { float: left; color: #444;font-size: 16px;}<\/style><div id=\"sp_easy_accordion-1791374744\"><div id=\"sp-ea-6242\" class=\"sp-ea-one sp-easy-accordion\" data-ea-active=\"ea-click\" data-ea-mode=\"vertical\" data-preloader=\"\" data-scroll-active-item=\"\" data-offset-to-scroll=\"0\"><div class=\"ea-card ea-expand sp-ea-single\"><h3 class=\"ea-header\"><a class=\"collapsed\" id=\"ea-header-62420\" role=\"button\" data-sptoggle=\"spcollapse\" data-sptarget=\"#collapse62420\" aria-controls=\"collapse62420\" href=\"#\" aria-expanded=\"true\" tabindex=\"0\"><i aria-hidden=\"true\" role=\"presentation\" class=\"ea-expand-icon eap-icon-ea-expand-minus\"><\/i> What supplier changes should trigger a review?<\/a><\/h3><div class=\"sp-collapse spcollapse collapsed show\" id=\"collapse62420\" data-parent=\"#sp-ea-6242\" role=\"region\" aria-labelledby=\"ea-header-62420\"> <div class=\"ea-body\"><p>Changes involving material sources, composition, manufacturing locations, subcontractors, or processing methods may require review against the applicable purchase specification and program requirements.<\/p><\/div><\/div><\/div><div class=\"ea-card sp-ea-single\"><h3 class=\"ea-header\"><a class=\"collapsed\" id=\"ea-header-62421\" role=\"button\" data-sptoggle=\"spcollapse\" data-sptarget=\"#collapse62421\" aria-controls=\"collapse62421\" href=\"#\" aria-expanded=\"false\" tabindex=\"0\"><i aria-hidden=\"true\" role=\"presentation\" class=\"ea-expand-icon eap-icon-ea-expand-plus\"><\/i> Should every shielding material be held in reserve?<\/a><\/h3><div class=\"sp-collapse spcollapse \" id=\"collapse62421\" data-parent=\"#sp-ea-6242\" role=\"region\" aria-labelledby=\"ea-header-62421\"> <div class=\"ea-body\"><p>No universal inventory approach applies to every shielding material. Inventory planning should consider replacement availability, storage requirements, expected demand, and the consequences of a supply interruption.<\/p><\/div><\/div><\/div><div class=\"ea-card sp-ea-single\"><h3 class=\"ea-header\"><a class=\"collapsed\" id=\"ea-header-62422\" role=\"button\" data-sptoggle=\"spcollapse\" data-sptarget=\"#collapse62422\" aria-controls=\"collapse62422\" href=\"#\" aria-expanded=\"false\" tabindex=\"0\"><i aria-hidden=\"true\" role=\"presentation\" class=\"ea-expand-icon eap-icon-ea-expand-plus\"><\/i> How should competing delivery promises be compared?<\/a><\/h3><div class=\"sp-collapse spcollapse \" id=\"collapse62422\" data-parent=\"#sp-ea-6242\" role=\"region\" aria-labelledby=\"ea-header-62422\"> <div class=\"ea-body\"><p>Compare suppliers using equivalent specifications and delivery milestones. Determine whether quoted schedules account for required processing, fabrication, inspection, documentation, and delivery requirements rather than comparing stock availability alone.<\/p><\/div><\/div><\/div><\/div><\/div>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What supplier changes should trigger a review?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Changes involving material sources, composition, manufacturing locations, subcontractors, or processing methods may require review against the applicable purchase specification and program requirements.\"}},{\"@type\":\"Question\",\"name\":\"Should every shielding material be held in reserve?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No universal inventory approach applies to every shielding material. Inventory planning should consider replacement availability, storage requirements, expected demand, and the consequences of a supply interruption.\"}},{\"@type\":\"Question\",\"name\":\"How should competing delivery promises be compared?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Compare suppliers using equivalent specifications and delivery milestones. Determine whether quoted schedules account for required processing, fabrication, inspection, documentation, and delivery requirements rather than comparing stock availability alone.\"}}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Supply disruption can turn a routine shielding order into an engineering and scheduling problem. For defence and aerospace programs with radiation shielding requirements, material availability is only one part of delivery readiness. Fabrication capacity, processing dependencies, documentation, and approval requirements can also affect when a component becomes usable. Sourcing critical shielding materials therefore requires a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6017,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[19],"tags":[],"class_list":["post-6240","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-radiation-protection"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Supply Chain Disruption &amp; Shielding Material Sourcing<\/title>\n<meta name=\"description\" content=\"Learn how supply chain disruption affects radiation shielding material sourcing, supplier dependencies, documentation, fabrication and continuity planning.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.canadametal.com\/es\/supply-chain-disruption-shielding-material-sourcing\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Supply Chain Disruption &amp; Shielding Material Sourcing\" \/>\n<meta property=\"og:description\" content=\"Learn how supply chain disruption affects radiation shielding material sourcing, supplier dependencies, documentation, fabrication and continuity planning.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.canadametal.com\/supply-chain-disruption-shielding-material-sourcing\/\" \/>\n<meta property=\"og:site_name\" content=\"Canada Metal\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-11T07:26:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-11T08:45:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.canadametal.com\/wp-content\/uploads\/2016\/10\/radiation-protection-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutos\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Supply Chain Disruption & Shielding Material Sourcing","description":"Learn how supply chain disruption affects radiation shielding material sourcing, supplier dependencies, documentation, fabrication and continuity planning.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.canadametal.com\/es\/supply-chain-disruption-shielding-material-sourcing\/","og_locale":"es_ES","og_type":"article","og_title":"Supply Chain Disruption & Shielding Material Sourcing","og_description":"Learn how supply chain disruption affects radiation shielding material sourcing, supplier dependencies, documentation, fabrication and continuity planning.","og_url":"https:\/\/www.canadametal.com\/supply-chain-disruption-shielding-material-sourcing\/","og_site_name":"Canada Metal","article_published_time":"2026-11-11T07:26:44+00:00","article_modified_time":"2026-11-11T08:45:56+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/www.canadametal.com\/wp-content\/uploads\/2016\/10\/radiation-protection-1024x683.png","type":"image\/png"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"admin","Tiempo de lectura":"5 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.canadametal.com\/supply-chain-disruption-shielding-material-sourcing\/#article","isPartOf":{"@id":"https:\/\/www.canadametal.com\/supply-chain-disruption-shielding-material-sourcing\/"},"author":{"name":"admin","@id":"https:\/\/www.canadametal.com\/es\/#\/schema\/person\/88840658bf063c569908a58717a25e24"},"headline":"How Supply Chain Disruption Is Changing the Way Defense and Aerospace Programs Source Critical Shielding Materials","datePublished":"2026-11-11T07:26:44+00:00","dateModified":"2026-11-11T08:45:56+00:00","mainEntityOfPage":{"@id":"https:\/\/www.canadametal.com\/supply-chain-disruption-shielding-material-sourcing\/"},"wordCount":984,"publisher":{"@id":"https:\/\/www.canadametal.com\/es\/#organization"},"image":{"@id":"https:\/\/www.canadametal.com\/supply-chain-disruption-shielding-material-sourcing\/#primaryimage"},"thumbnailUrl":"https:\/\/www.canadametal.com\/wp-content\/uploads\/2016\/10\/radiation-protection.png","articleSection":["Radiation Protection"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/www.canadametal.com\/supply-chain-disruption-shielding-material-sourcing\/","url":"https:\/\/www.canadametal.com\/supply-chain-disruption-shielding-material-sourcing\/","name":"Supply Chain Disruption & Shielding Material Sourcing","isPartOf":{"@id":"https:\/\/www.canadametal.com\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.canadametal.com\/supply-chain-disruption-shielding-material-sourcing\/#primaryimage"},"image":{"@id":"https:\/\/www.canadametal.com\/supply-chain-disruption-shielding-material-sourcing\/#primaryimage"},"thumbnailUrl":"https:\/\/www.canadametal.com\/wp-content\/uploads\/2016\/10\/radiation-protection.png","datePublished":"2026-11-11T07:26:44+00:00","dateModified":"2026-11-11T08:45:56+00:00","description":"Learn how supply chain disruption affects radiation shielding material sourcing, supplier dependencies, documentation, fabrication and continuity planning.","breadcrumb":{"@id":"https:\/\/www.canadametal.com\/supply-chain-disruption-shielding-material-sourcing\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.canadametal.com\/supply-chain-disruption-shielding-material-sourcing\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.canadametal.com\/supply-chain-disruption-shielding-material-sourcing\/#primaryimage","url":"https:\/\/www.canadametal.com\/wp-content\/uploads\/2016\/10\/radiation-protection.png","contentUrl":"https:\/\/www.canadametal.com\/wp-content\/uploads\/2016\/10\/radiation-protection.png","width":1536,"height":1024},{"@type":"BreadcrumbList","@id":"https:\/\/www.canadametal.com\/supply-chain-disruption-shielding-material-sourcing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.canadametal.com\/es\/"},{"@type":"ListItem","position":2,"name":"How Supply Chain Disruption Is Changing the Way Defense and Aerospace Programs Source Critical Shielding Materials"}]},{"@type":"WebSite","@id":"https:\/\/www.canadametal.com\/es\/#website","url":"https:\/\/www.canadametal.com\/es\/","name":"Canada Metal","description":"Lead Suppliers, Lead Ingots | Canada Metal North America","publisher":{"@id":"https:\/\/www.canadametal.com\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.canadametal.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/www.canadametal.com\/es\/#organization","name":"Canada Metal","url":"https:\/\/www.canadametal.com\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.canadametal.com\/es\/#\/schema\/logo\/image\/","url":"https:\/\/www.canadametal.com\/wp-content\/uploads\/2025\/10\/cropped-N299.3-16-CMNA-Radiation-Shielding-1_1-1.png","contentUrl":"https:\/\/www.canadametal.com\/wp-content\/uploads\/2025\/10\/cropped-N299.3-16-CMNA-Radiation-Shielding-1_1-1.png","width":1754,"height":155,"caption":"Canada Metal"},"image":{"@id":"https:\/\/www.canadametal.com\/es\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.canadametal.com\/es\/#\/schema\/person\/88840658bf063c569908a58717a25e24","name":"admin","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.canadametal.com\/es\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/4904aad20a6ce11bbf38eb74d138f014553fc2124748ee937b362ca6e9660e89?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4904aad20a6ce11bbf38eb74d138f014553fc2124748ee937b362ca6e9660e89?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/canadametal.com"],"url":"https:\/\/www.canadametal.com\/es\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.canadametal.com\/es\/wp-json\/wp\/v2\/posts\/6240","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.canadametal.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.canadametal.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.canadametal.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.canadametal.com\/es\/wp-json\/wp\/v2\/comments?post=6240"}],"version-history":[{"count":5,"href":"https:\/\/www.canadametal.com\/es\/wp-json\/wp\/v2\/posts\/6240\/revisions"}],"predecessor-version":[{"id":6254,"href":"https:\/\/www.canadametal.com\/es\/wp-json\/wp\/v2\/posts\/6240\/revisions\/6254"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.canadametal.com\/es\/wp-json\/wp\/v2\/media\/6017"}],"wp:attachment":[{"href":"https:\/\/www.canadametal.com\/es\/wp-json\/wp\/v2\/media?parent=6240"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.canadametal.com\/es\/wp-json\/wp\/v2\/categories?post=6240"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.canadametal.com\/es\/wp-json\/wp\/v2\/tags?post=6240"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}